Helicopter Transportation UH-60 Black Hawk Patch US Army

$56.00

In the late 1960s, the United States Army began forming requirements for a helicopter to replace the UH-1 Iroquois, and designated the program as the Utility Tactical Transport Aircraft System (UTTAS). The Army also initiated the development of a new, common turbine engine for its helicopters that would become the General Electric T700. Based on experience in Vietnam, the Army required significant performance, survivability and reliability improvements from both UTTAS and the new powerplant. The Army released its UTTAS request for proposals (RFP) in January 1972. The RFP also included air transport requirements. Transport within the C-130 limited the UTTAS cabin height and length.

Add To Cart

In the late 1960s, the United States Army began forming requirements for a helicopter to replace the UH-1 Iroquois, and designated the program as the Utility Tactical Transport Aircraft System (UTTAS). The Army also initiated the development of a new, common turbine engine for its helicopters that would become the General Electric T700. Based on experience in Vietnam, the Army required significant performance, survivability and reliability improvements from both UTTAS and the new powerplant. The Army released its UTTAS request for proposals (RFP) in January 1972. The RFP also included air transport requirements. Transport within the C-130 limited the UTTAS cabin height and length.

In the late 1960s, the United States Army began forming requirements for a helicopter to replace the UH-1 Iroquois, and designated the program as the Utility Tactical Transport Aircraft System (UTTAS). The Army also initiated the development of a new, common turbine engine for its helicopters that would become the General Electric T700. Based on experience in Vietnam, the Army required significant performance, survivability and reliability improvements from both UTTAS and the new powerplant. The Army released its UTTAS request for proposals (RFP) in January 1972. The RFP also included air transport requirements. Transport within the C-130 limited the UTTAS cabin height and length.

Vietnam War Original ARVN 3rd Armored Battalion Patch
$30.00
Vietnam War ARVN VNAF F-5 Fighter Squadron Hand Embroidered Patch
$35.00
Vietnam War Original 5th Special Forces Green Beret MACV SOG (TU THAN) 235 RRU ARVN Patch
$55.00
Vietnam War ARVN 52nd Ranger BN South Vietnamese Army
$40.00
Vietnam War Prisoner Of War (POW) Medal
$20.00